No. CNCA-C01-01:2024
Compulsory Certification Implementation Rules
Electric Wires and Cables
Published: 2024-04-08 Implemented: 2024-07-01
National Certification and Accreditation Administration of
the People’s Republic of China
Contents
4 Certification Unit Division 3
5.1 Submission and Acceptance of Certification Application 3
5.2 Certification Application Documentation 4
5.3 Implementation Arrangements 4
6 Certification Implementation 5
6.2 Certification Evaluation and Decision 7
7 Post-Certification Surveillance 8
7.1 Follow-up Inspection after Certification 8
7.2 Sample Testing from the Production Site 9
7.3 Sample Testing from the Open Market 10
7.4 Frequency and Timing of PostCertification Surveillance 10
7.5 Records of Post-Certification Surveillance 11
7.6 Evaluation of Post-Certification Surveillance Results 11
8 Certification Certificate 11
8.1 Maintenance of the Certification Certificate 11
8.2 Changes to Products Covered by the Certification Certificate 12
8.3 Extension of Products Covered by the Certification Certificate 12
8.4 Cancellation, Suspension and Withdrawal of Certificate 13
9.1 Permitted Certification Mark Pattern 14
9.2 Use of Deformed Certification Mark 14
11 Certification Responsibilities 15
12 Detailed Rules for Certification Implementation 15
These implementation rules are established based on the safety risks and conformity assessment risks associated with electric wires and cables, and set out the basic principles and requirements for implementing compulsory certification for them.
These implementation rules shall be applied in conjunction with the following general implementation rules issued by the National Certification and Accreditation Administration (CNCA), including: the Compulsory Certification Implementation Rules — Classification Management of Production Enterprises, Selection and Determination of Certification Modes; the Compulsory Certification Implementation Rules — Utilization of Production Enterprises’ Testing Resources and Other Certification Results; the Compulsory Certification Implementation Rules — Factory Quality Assurance Capability Requirements; the Compulsory Certification Implementation Rules — General Requirements for Factory Inspection etc.
Designated Certification bodies shall develop detailed rules for certification implementation based on the requirements specified in these implementation rules and the general implementation rules, and implement the detailed rules in conjunction with these implementation rules and the general implementation rules.
The production enterprises shall ensure that the certified products they produce meet the certification requirements continuously.
These implementation rules apply to electric wires and cables falling within the scope of the China Compulsory Certification (CCC) Catalogue.
Any adjustment to the scope resulting from changes in laws, regulations, standards, industrial policies, etc., shall be subject to documents issued by the CNCA.
2 Standards for Certification
In principle, the current valid versions published by the national standardization authority shall be applied for the above standards.
The basic certification mode for compulsory certification of electric wires and cables is:
Type testing + postcertification surveillance
The post-certification surveillance above refers to one of the following three methods: follow-up inspection after certification, sample testing or inspection from the production site, or sample testing or inspection from the open market.
Designated certification bodies shall implement classification management of production enterprises in accordance with the requirements of the Compulsory Certification Implementation Rules — Classification Management of Production Enterprises, Selection and Determination of Certification Modes, and may, based on the classification management results, add relevant elements such as an initial factory inspection as appropriate to the basic certification mode, and combine the various post-certification surveillance methods, to determine the certification mode applicable to the certification applicant.
In principle, certification units shall be divided by product type, model designation, etc. (see Annex for details).
Where identical products are produced by the same production enterprise but under different manufacturers, type testing may be performed on samples from only one unit; for products under other manufacturers, documentation shall be provided for consistency verification.
Designated certification body shall, in accordance with the relevant CNCA provisions and the Annexes to these implementation rules, and taking into account the classification management of production enterprises, specify detailed requirements for unit division in their detailed rules for certification implementation.
The certification applicant shall submit the certification application to the certification body in an appropriate manner. The certification body shall process the application and provide feedback on acceptance or nonacceptance within the timeframe specified in its detailed rules for certification implementation.
Designated certification bodies shall not accept applications that do not comply with the requirements of national laws, regulations or relevant industrial policies.
Designated certification bodies shall specify, in its detailed rules for certification implementation, a list of required documentation for certification application based on laws, regulations, standards, and certification implementation requests (including at least the certification application form or contract, proof of registration of the applicant/manufacturer/enterprise, etc.)
For production enterprises not subject to an initial factory inspection during certification, the applicant shall submit a self-evaluation report on the factory’s quality assurance capability.
The certification applicant shall provide all required documentation as specified in the detailed rules for certification implementation. The designated certification body is responsible for reviewing, managing, retaining, and maintaining the confidentiality of such documentation, and shall inform the applicant of the documentation review results.
Designated certification bodies shall agree with the applicant on the respective responsibilities and arrangements for each stage of certification implementation. Based on the manufacturer's actual situation and the classification results, designated certification bodies shall determine the specific implementation plan in accordance with these implementation rules and the detailed rules for certification implementation, and notify the applicant accordingly.
After completing the documentation review, the certification body shall develop a type testing plan and inform the certification applicant.
The type testing plan shall include all sample requirements and quantities, test items and standards, and laboratory information, etc.
The certification body shall specify the requirements for sample submission or sampling for type testing in its detailed rules for certification implementation. Typically, samples for type testing shall be selected and submitted by the certification applicant as representative samples for testing based on the requirements of the designated certification body. If necessary, the designated certification body may also obtain samples through on-site sampling/sealing.
The certification applicant shall ensure that the samples provided are consistent with products actually manufactured. The designated certification body and/or laboratory shall verify the authenticity of the samples provided. If the designated laboratory has doubts about the sample authenticity, it shall inform the designated certification body and take appropriate action.
Designated certification bodies shall, in accordance with relevant CNCA provisions, specify in its detailed rules for certification implementation, the list of critical components and materials used in the product, along with related requirements.
For critical components and materials purchased domestically that are within the scope of compulsory certification, the product enterprise shall provide valid compulsory certification certificates. For critical components and materials not subject to compulsory certification, the designated certification body shall specify in its detailed rules for certification implementation the conditions and detailed requirements under which voluntary certification certificates or type testing reports acceptable or recognizable.
In principle, type testing shall cover all applicable items specified in the product standards.
In principle, type testing shall be conducted in laboratories designated by CNCA. The designated laboratory shall conduct type testing on samples and maintain complete records of the entire testing process, to ensure traceability of the testing process and results.
Without compromising the validity of certification results, the designated certification body may, in accordance with the Compulsory Certification Implementation Rules — Utilization of Production Enterprises’ Testing Resources and Other Certification Results, establish management procedures under which designated laboratory personnel carry out or witness testing using the manufacturer’s testing resources, with the testing report issued by the designated laboratory. The designated laboratory shall ensures the authenticity, correctness and traceability of test results. The designated certification body shall specify detailed requirements and procedures in its detailed rules for certification implementation.
The designated certification body shall prescribe a unified format for type testing reports.
After completion of type testing, the designated laboratory shall promptly issue a type testing report to the designated certification body and the certification applicant. The test report shall contain a description of information relevant to certification for all products within the certification unit. The certification applicant shall ensure that a complete and valid type testing report can be provided to the certification body and enforcement authorities during post-certification surveillance.
The certification body shall comprehensively evaluate the type testing results and relevant documentation/information, and make a certification decision. Where the certification requirements are met, a certificate shall be issued. Where any nonconformity is found, the certification body shall reject the certification application and terminate the certification process.
The designated certification body shall specify clear timeframes for each stage of the certification and ensure that relevant work is completed within those timeframes. The certification applicant shall actively cooperate with certification activities. Under normal circumstances, the designated certification body shall issue the certificate to the certification applicant within 90 days from the date of application acceptance.
Post-certification surveillance refers to the supervision conducted by the designated certification body over certified products and their production enterprises. The designated certification body shall, based on its classification management of product enterprises and actual circumstances, specify in its detailed rules for certification implementation the requirements for selecting appropriated post-certification surveillance methods.
Based on the classification management of product enterprises, the designated certification body shall conduct effective follow-up inspections on certified products and their production enterprises, to verify that the production enterprise’s quality assurance capability continues to meet certification requirements, that the certified products continue to comply with standard requirements, and maintain consistency with type testing samples.
Follow-up inspections after certification shall be conducted during normal production at the product enterprise’s site, preferably without any prior notice to the inspected party. For products that are not continuously produced, the certification applicant shall submit relevant production plan to the designated certification body to facilitate effective post-certification surveillance.
The designated certification body shall develop specific followup inspection requirements after certification, product consistency inspection requirements, and product enterprise’s quality control testing requirements in accordance with the Compulsory Certification Implementation Rules — Factory Quality Assurance Capability Requirements, and shall specify these in its detailed rules for certification implementation.
Sample testing from the production site shall cover all certified units.
When sample testing from the production site is adopted as a postcertification surveillance method, the certification applicant, manufacturer, and product enterprise shall cooperate accordingly.
The designated certification body shall specify in the detailed rules for certification implementation the specific content and requirements for sample testing from the production site.
Where testing is required, the production enterprise shall submit samples to a designated laboratory. The designated certification body may also, in accordance with the Compulsory Certification Implementation Rules — Utilization of Production Enterprises’ Testing Resources and Other Certification Results, establish management procedures to use the manufacturer’s testing resources to conduct (or witness) testing, with the testing report issued by the designated laboratory.
Sample testing from the open market shall cover a certified products at a defined proportion.
When sample testing from the open market is used as a surveillance method, the certification applicant, manufacturer and production enterprises shall cooperate and confirm samples taken from the market.
The designated certification body shall specify in the detailed rules for certification implementation the specific content and requirements for sample testing from the open market.
Based on classification management of product enterprises, the designated body shall apply different surveillance frequencies for different categories of production enterprises, and reasonably determine the timing of surveillance. Specific principles shall be specified in its detailed rules for certification implementation.
The designated certification body shall record the archive the entire postcertification surveillance process to ensure traceability of the certification process and results.
The designated certification body shall comprehensively evaluate the results of followup inspections, sample testing results, and relevant documentation/information. Where the evaluation is passed, the certificate may be maintained and the certification mark may continue to be used. Where the evaluation fails, the certification body shall suspend or withdraw the certificate based as appropriate, and announce such actions accordingly.
The validity period of the compulsory certification certificate for products covered by these implementation rules is 5 years. During the validity period, the validity of the certificate depends on continued maintenance through postcertification surveillance by the designated certification body.
Where the certificate expires and continued use is desired, the certification applicant shall submit a certification application no late than 90 days before the expiry date. If the results of the last postcertification surveillance within the certificate’s validity period are satisfactory, the designated certification body shall directly issue a new certificate upon receiving the application.
After product certification, if changes occur to critical components and materials, safetyrelated design or electrical structure of the certified product, or in other matters specified in the detailed rules for certification implementation of the certification body, the certification applicant shall apply to the designated certification body for a modification and obtain approval/completion of filing before implementing such changes.
The designated certification body shall specify in its detailed rules for certification implementation the specific requirements for certification modification, including the scope and procedures for such changes.
Based on the content of the change, the certification body shall evaluate the submitted documentation and decide whether to approve the modification. If sample testing and/or factory inspection is required, the modification shall be granted only after successful completion of such testing and/or inspection. In principle, the representative model initially subjected to full type testing shall be used as the basis for modification evaluation.
When a certification applicant wishes to extend the scope of products covered by an existing certificate, it shall submit a certification application for the product extension to the designated certification body.
The certification body shall, based on the technical documentation provided by the certification applicant for the extended products, verify the differences between the extended products and the originally certified products, confirm the validity of the original certification results for the extended products, and conduct supplementary testing or inspection of products from the production site to address such differences. If the testing or inspection is passed, the designated certification body shall issue a separate certificate or reissue the certificate, as requested by the certification applicant.
In principle, the representative model initially subjected to full type testing shall be used as the basis for extension evaluation.
Cancellation, suspension and withdrawal of certification certificates shall be conducted in accordance with the Provisions on Administration of China Compulsory Certification (CCC) and the Compulsory Certification Implementation Rules — Cancellation, Suspension and Withdrawal of Certificate, as well as the relevant provisions of the certification body. The designated certification body shall determine the product categories and scope that do not meet certification requirements, and shall publicly announce certificates that have been cancelled, suspended or withdrawn through appropriate means.
Use of the certificates shall comply with the Requirements on the Administration of China Compulsory Certification Marks.
The certification applicant shall affix the standard-format certification mark or a printed/molded certification mark at appropriate position of the product body or on the product nameplate, and shall ensure that the management and use of the certification mark comply with the Requirements on the Administration of China Compulsory Certification Marks.
![]() |
A deformed certification mark is permitted, i.e., the abbreviation “CCC” for “China Compulsory Certification”, in a font size appropriate for the external dimensions of electric wires and cables.
The certification mark shall be printed or molded on the outer surface of the electric wires or cables. For products where the outermost layer is a braided layer, the certification mark may be printed or molded on the outer surface of the insulated core inside the braided layer.
For products where the certification mark is printed or molded on the outer surface of the insulated core inside the braided layer, a standard-format certification mark or a printed/molded certification mark shall be affixed to the product nameplate. For other products, a standard-format certification mark or a printed/molded certification mark may be affixed to the product nameplate.
Designated certification bodies and laboratories shall establish and publish relevant fee schedules, and charge fees to certification applicants in accordance with those schedules.
The designated certification body shall be responsible for the certification conclusions it reaches.
The designated laboratories shall be responsible for the testing results and testing reports.
The designated certification body and the factory inspectors it assigns shall be responsible for the factory inspection conclusions.
The certification applicant shall be responsible for the authenticity and legality of the application documentation and samples it submits.
Designated certification bodies shall develop scientific, reasonable, and operable detailed rules for certification implementation based on the principles and requirements of these implementation rules. The detailed rules for certification implementation shall be published and implemented after being filed with the CNCA. The detailed rules for certification implementation shall include at least the following:
(1) Certification process and timeframe requirements;
(2) Selection of certification modes and related requirements;
(3) Detailed rules for certification unit division and related requirements;
(4) Requirements for classification management of production enterprises;
(5) Certification application documentation and related requirements;
(6) Sample testing requirements (including type testing, sample testing from the production site or from the open market, and use of production enterprises’ testing resources);
(7) Initial factory inspection and post-certification surveillance requirements (including coverage requirements of factory inspection including product category division, factory quality assurance capability and product consistency inspection requirements, production enterprise’s quality control testing requirements, quality control testing requirements for critical components and materials, factory inspection requirements for ODM/OEM models, surveillance frequency, sample testing or inspection requirements, etc.);
(8) Requirements for certification modification (including standard version updates);
(9) List of critical components and materials;
(10) Basis of fees and related requirements;
(11) Process and time limit requirements for technical disputes and appeals.
Unit No. | Unit Name1 | Model Designation2 | Standards3 |
1 | PVC insulated non-sheathed wires and cables | 60227 IEC 01(BV) 60227 IEC 02(RV) 60227 IEC 05(BV) 60227 IEC 06(RV) 60227 IEC 07(BV-90) 60227 IEC 08(RV-90) | GB/T 5023.3 |
BV BLV BVR | JB/T 8734.2 | ||
2 | PVC insulated and PVC sheathed cables | 60227 IEC 10(BVV) | GB/T 5023.4 |
BVV BLVV BVVB BLVVB | JB/T 8734.2 | ||
3 | PVC insulated flexible cables and wires | RVB RVS RVV | JB/T 8734.3 |
60227 IEC 41(RTPVR) 60227 IEC 43(SVR) 60227 IEC 52(RVV) 60227 IEC 56(RVV-90) 60227 IEC 53(RVV) 60227 IEC 57(RVV-90) | GB/T 5023.5 | ||
4 | PVC insulated and PVC sheathed lift cables and flexible connection cables | 60227 IEC 71c(TVV) 60227 IEC 71f(TVVB) | GB/T 5023.6 |
TVVB | JB/T 8734.6 | ||
5 | PVC insulated and PVC sheathed oil-resistant flexible cables | 60227 IEC 74(RVVYP) 60227 IEC 75(RVVY) | GB/T 5023.7 |
6 | PVC insulated wires for internal wiring of equipment and screened wires | AV AVR AVRB AVRS AVVR AV-90 AVR-90 | JB/T 8734.4 |
AVP RVP RVVP RVVP1 RVVPS AVP-90 RVP-90 | JB/T 8734.5 | ||
7 | Heat resistant rubber insulated cables | 60245 IEC 03(YG) | GB/T 5013.3 |
60245 IEC 04(YYY) 60245 IEC 05(YRYY) 60245 IEC 06(YYY) 60245 IEC 07(YRYY) | GB/T 5013.7 | ||
8 | Rubber insulated lift cables and arc welding cables | 60245 IEC 70(YTB) 60245 IEC 74(YT) 60245 IEC 75(YTF) | GB/T 5013.5 |
60245 IEC 81(YH) 60245 IEC 82(YHF) | GB/T 5013.6 | ||
9 | Rubber insulated braided flexible cables | 60245 IEC 89(RQB) | GB/T 5013.8 |
RE RES REH | JB/T 8735.3 | ||
10 | Tough rubber sheathed flexible cables and wires for general purposes | 60245 IEC 53(YZ) 60245 IEC 57(YZW) 60245 IEC 66(YCW) 60245 IEC 58(YSF) 60245 IEC 58f(YSFB) | GB/T 5013.4 |
YQ YQW YZ YZW YZB YZWB YC YCW | JB/T 8735.2 |
Note 1: Flame retardant electric wires and cables are not considered separate certification units; they are classified under the same product standard units as the corresponding products.
Note 2: Requirements for the model designation of flame-retardant electric wires and cables are given in Annex 2.
Note 3: For flame-retardant electric wires and cables, the standards for certification are: product standard + combustion characteristics standard. The applicable standard for combustion characteristics (singlecable flame retardant performance and bunched flame retardant performance) is GB/T 19666, and the applicable standard for combustion characteristics (flame retardant class 1 and class 2 without subclassification) is GB 31247.
These supplementary requirements apply to flame-retardant electric wires and cables whose product standards comply with the standards for certification, and whose flame-retardant performance meets the corresponding requirements for singlecable flame-retardant performance or bunched cable flame-retardant performance as specified in GB/T 19666, and/or the corresponding requirements for flame-retardant class 1 or class 2 specified in GB 31247.
Flame-retardant characteristic standard | Flame retardant characteristic code | Description |
GB 31247 | B1 | Flame-retardant class 1 |
B2 | Flame-retardant class 2 | |
GB/T 19666 | Za | Singlecable flame retardant |
ZA | Flame-retardant class A | |
ZB | Flame-retardant class B | |
ZC |
| |
ZD | Flame-retardant class D | |
a For PVC insulated cables, Z is omitted | ||
The model designation of a flame-retardant electric wires or cables consists of two parts: the flame-retardant characteristic code and the relevant wire/ cable model designation, as shown in Figure 1.
- | - | |||||||||
Relevant cable model designation
| ||||||||||
Flame retardant characteristic code (GB/T 19666) (if applicable) | ||||||||||
Flame retardant characteristic code (GB 31247) (if applicable) | ||||||||||
Flame-retardant electric wires and cables shall be represented by the flame-retardant characteristic code, product model designation, specification, flame retardant standard number, and product standard number.
Example 1: Single-core non-sheathed cable with rigid conductor for general purposes, flame retardant class D, represented as:
ZD-60227 IEC 01(BV) 450/750V (specification omitted) GB/T 19666—2019 / GB/T 5023.3—2008
Example 2: Single-core non-sheathed cable with rigid conductor for general purposes, Flame retardant class 2, represented as:
B2-60227 IEC 01(BV) 450/750V (specification omitted) GB 31247—2014 / GB/T 5023.3—2008
Example 3: Single-core non-sheathed cable with rigid conductor for general purposes, Flame retardant class 2, flame retardant class D, represented as:
B2-ZD-60227 IEC 01(BV) 450/750V (specification omitted) GB 31247—2014 / GB/T 19666—2019 / GB/T 5023.3—2008